Cheers Dan and Martin, its always nice to recieve favourable comments..
Dan, due to the very low freeboard the hull is empty of electrics apart from the rudder servo, two MFA500 motors with 2:1 geaboxes and the battery holder. All the main power system is in the deck house and although not yet completed this will house an electronize 30amp speedo and basic futaba 2 channel 40Mhz reciever. The other reason for this design apart from reducing the risk of water damage from the bilges? is that due to the form of the hull the dispacement is staggering and requires two 12volt nicad packs plus the addtion of a 25lb piece of 2" square stainless steel bar to get it near water line.
Regards
Si
Just to prove authenticity i found this on the net... i did add the additional boom crane on the aft deck for interest....